Hacking & Demolition Guide for Homeowners and Business Owners in Singapore (2024)
Thinking about tearing down a wall or removing floor tiles as part of your renovation? In Singapore, hacking and demolition works are highly regulated — whether it’s for a residential HDB flat or a commercial office.
This guide explains:
- What hacking and demolition include
- What’s allowed under HDB or MCST rules
- How to apply for hacking permits
- What to expect from a licensed contractor
What is Hacking or Demolition Work?
Hacking refers to the controlled removal of existing built-in features, walls, flooring, ceilings, or fittings during renovation.
Demolition typically applies to larger-scale removal of structural elements or entire interiors — common in offices, industrial units, or full-home makeovers.
Types of Hacking & Demolition Services in Singapore
Residential
- HDB wall and floor tile hacking
- Toilet and kitchen removal
- Ceiling and partition removal
- Cabinet dismantling and flooring stripping
Commercial & Retail
- Partition and false ceiling dismantling
- Glass panel and door removal
- Raised flooring, power point & trunking removal
- Full reinstatement for end-of-lease handover
Industrial
- Concrete slab and beam hacking
- Warehouse clearance and machine base removal
What Can Be Hacked Legally in HDB Flats?
You can hack:
- Non-load bearing partition walls
- Floor and wall tiles
- Bathroom fittings (with waterproofing reinstated)
You cannot hack:
- Structural walls
- Columns, beams, or slabs
- Gas risers or main electrical ducts
All HDB hacking requires written approval from HDB. Unauthorized hacking may result in fines or reinstatement orders.
How to Apply for HDB Hacking Permit
- Submit your proposed floor plan and scope of work via your contractor
- Wait for HDB review and written approval (usually 5–10 working days)
- Display the permit on-site during works
Your contractor must be HDB-registered to carry out hacking.
Why Hire a Licensed Hacking & Demolition Contractor?
- Complies with HDB, MCST, or BCA regulations
- Submits all necessary permits on your behalf
- Uses dust- and noise-controlled equipment
- Provides protection for lifts, corridors, and neighbours
- Ensures licensed debris disposal with NEA-approved haulers
Typical Timeline & Process
- Site Visit & Floor Plan Review
- Permit Submission (if required)
- Hacking Works Start (usually within 1–2 weeks)
- Debris Removal & Site Cleaning
Final Tips Before You Hack
- Always confirm which walls are structural
- Get hacking plans approved before starting
- Coordinate with your renovation contractor to avoid overlap
- Ask if reinstatement will be required (especially for rental units)
Need Professional Hacking or Demolition Help?
We’ve completed hundreds of compliant and efficient hacking projects across Singapore — from HDB flats in Bedok to office reinstatements in Orchard.
Get in touch with us for:
- Residential wall and tile hacking
- Commercial and industrial demolition
- Office reinstatement before handover